Response zone
Glossary of common terms used in the management of land contamination, published on the Planning Portal, defines the response zone as: ‘The perforated section of standpipe which allows gas in the unsaturated zone or groundwater below the water table to enter a standpipe.’
The response zone is typically located at the depth where the parameter of interest (e.g., water level, gas concentration) is expected to be measured. It is positioned based on site-specific conditions, such as the depth of the water table or the presence of contamination.
The response zone is made of a perforated or slotted section of the standpipe, which permits fluid or gas to enter. Surrounding the slotted section there is often a filter pack (e.g., gravel or sand) that helps prevent fine particles from clogging the standpipe while allowing water or gas to flow freely.
It facilitates accurate measurement of groundwater levels, sampling of groundwater, or the detection of ground gases. The response zone isolates the specific depth of interest to avoid interference from other layers or zones. To ensure that the response zone only interacts with the desired geological stratum, bentonite or other sealing materials are placed above and below the response zone. This prevents cross-contamination or flow between different layers of soil or rock.
[edit] Related articles on Designing Buildings
Featured articles and news
UKCW London to tackle sector’s most pressing issues
AI and skills development, ecology and the environment, policy and planning and more.
Managing building safety risks
Across an existing residential portfolio; a client's perspective.
ECA support for Gate Safe’s Safe School Gates Campaign.
Core construction skills explained
Preparing for a career in construction.
Retrofitting for resilience with the Leicester Resilience Hub
Community-serving facilities, enhanced as support and essential services for climate-related disruptions.
Some of the articles relating to water, here to browse. Any missing?
Recognisable Gothic characters, designed to dramatically spout water away from buildings.
A case study and a warning to would-be developers
Creating four dwellings... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
The first line of defence against rain, wind and snow.
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description from the experts at Cornish Lime.























