Response zone
Glossary of common terms used in the management of land contamination, published on the Planning Portal, defines the response zone as: ‘The perforated section of standpipe which allows gas in the unsaturated zone or groundwater below the water table to enter a standpipe.’
The response zone is typically located at the depth where the parameter of interest (e.g., water level, gas concentration) is expected to be measured. It is positioned based on site-specific conditions, such as the depth of the water table or the presence of contamination.
The response zone is made of a perforated or slotted section of the standpipe, which permits fluid or gas to enter. Surrounding the slotted section there is often a filter pack (e.g., gravel or sand) that helps prevent fine particles from clogging the standpipe while allowing water or gas to flow freely.
It facilitates accurate measurement of groundwater levels, sampling of groundwater, or the detection of ground gases. The response zone isolates the specific depth of interest to avoid interference from other layers or zones. To ensure that the response zone only interacts with the desired geological stratum, bentonite or other sealing materials are placed above and below the response zone. This prevents cross-contamination or flow between different layers of soil or rock.
[edit] Related articles on Designing Buildings
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
The heritage of nuclear and conventional power stations.
New measures to stop people being ripped off
Government to protect families from cowboy builders and aggressive bailiffs.
New Futurebuild showcase brings an innovation-first approach.
National Planning Policy Framework
Understanding the 2026 changes.
ECA's public affairs priorities
Member consultation opens to shape priorities for 2027 to 2030.
Dutyholder responsibilities from 1 July 2026.
Where performance meets practice
The Building Envelope Stage at UKCW Birmingham.
CIAT publishes briefing on planning reforms.
Leaders in Learning for Practice Network
Call for conservation leaders in learning to register interest in new network.
The importance of early engagement
Construction lessons from the Trillium HealthWorks Experience Centre.
Mayors are to be given planning call in powers
Mayors across England will be able to make the most important planning decisions.
The Master Builder: William Butterfield and his times. Book review.